project
project
project
architect
OFFICE KGDVS
period
2012 - 2013
project
construction of sorting and drying hall, Herselt
budget
€ 650.000,00
surface area
2.200 m2
client
Arbor NV
status
finished

Arbor needed a drying hall intended for drying trees over 12 m tall before transport. The hall consists of a grid of steel columns topped with timber trusses reaching up to 43 m in length. The tip of the triangular trusses always points downward and one side is always horizontal. Driving rain is stopped by a perforated steel deck that forms the façade enclosing the entire structure.