project
project
architect
OFFICE KGDVS
period
2018 -
project
competition for the construction of a bicycle and pedestrian bridge, Antwerp
client
Stad Antwerpen
status
finished

The issue of the Kruger cycle bridge goes beyond the mere redesign of the railway crossing. The bridge forms a link within a broader infrastructural network, giving the project a wide range of opportunities for its surrounding environment. The project provides, through a few simple lines, a comfortable cycling connection. The total length of the bridge, 450 m, is divided into three zones of equal length. The straight approach sections, each approximately 150 m long, are exact mirror images of one another with respect to the axis of symmetry of the figure. They are centrally connected by a bridge deck of a further 150 m. Starting from the point of symmetry of the figure, the bridge is supported by the staircase and a buttress embedded in the embankment. The staircase and the abutment in the embankment, which form the shortest crossing over the railway, are positioned and designed in such a way that a compression arch can be activated. Moreover, the central span of the bridge deck is naturally prestressed, and the staircase, in its natural form, can also take on the role of structural support. Here, the largest span is also realised: the distance between the foot of the staircase and the connection of the bridge to the abutment in the embankment is 73 m.