As in 2015 (GVV-14-BXL), Gijs Van Vaerenbergh designed a temporary bridge made of crane elements over the canal, which this time remains in place throughout the entire summer. The bridge is an upgrade of its predecessor: the span is longer (55 m instead of 45 m), the kink in the bridge has been shifted away from the centre in order to protect the elements subjected to the largest bending moments, and heavier crane elements were used to achieve a greater clearance height. The latter turns this version into an entirely new structural challenge. The diagonals no longer lie in parallel planes but rotate around the longitudinal axis of the bridge, resulting in a different force distribution in the two vertical planes - the planes that behave as beams. The custom-made connection at the kink forms a zigzag line, in alignment with the elements it connects. At the ends, only two frames are required to connect the elements and to transfer the loads, via stacked concrete counterweights, to the quay.