

The new building on the site of the Remi-Quadrens special education campus is distinguished by its remarkable form. The plan is a perfect hexagon. The spatial layout and the load-bearing structure rigorously follow the geometry of the plan: the interior spaces are defined, on the one hand, by a load-bearing line following the outer perimeter and by an inward offset of this line, thereby creating a double-height central courtyard, and, on the other hand, by load-bearing lines drawn along all the medians of the figure. The floor slabs are constructed using precast concrete predalles, which circulate hyperstatically across the entire plan. Along the central ring, they cantilever to form a walkway, while along the outer ring, heavy concrete terraces are suspended in order to organise an external circulation route. The roof structure is radically deployed as an architectural element. The primary structure consists of twelve radial glulam beams resting on the median load-bearing lines. One central beam is allowed to run continuously, supporting all other beams at their point of convergence. Between the primary beams, secondary beams are arranged in a zigzag pattern, supporting a grid of timber I-joists. The joists are dimensioned based on the primary beams, taking into account the required fire resistance. All connections are executed in a concealed manner. At one location, the strict geometry of the plan is deliberately disrupted to accommodate a grandstand, giving rise to an engaging structural challenge. As the inner load-bearing line is interrupted in two sections at this point, a concrete wall is introduced. The walkway is suspended from this wall, allowing the circulation at first-floor level to be fully enclosed.