The architect chose to locate the youth centre largely underground and to build the sports hall above it. In this way, the sports hall is positioned at the same level as the existing sports hall. A footbridge provides the connection to the existing swimming pool. Due to the limited budget, the concrete façade panels were realised as a double insulated cavity wall: a sandwich construction consisting of a concrete outer façade panel and a concrete inner panel, with an insulation layer as the core. Between the insulation board and the inner panel there is a cavity that is concreted on site and causes the different panels to act together as a concrete wall. The floor of the sports hall consists of a thick 40 cm slab in which all HVAC ducts serving the underlying spaces are integrated.