Loading...
project
architect
Suède 36
period
2009 - 2011
budget
€ 150.000,00
client
Brussels gewest
status
finished

In the heart of Molenbeek, a new playground was designed with a structural framework based on steel construction, creatively and playfully articulated for children. The design is dominated by a tower volume, featuring two slides and a play cage at its top, which serves as the main visual and interactive focal point.