architect
Paul Bataille enClaire Ibens Design nv
period
2007 - 2010
budget
€ 1.700.000,00
surface area
1.420 m2
client
Créatons Isabelle de Borchgraeve sprl
in collaboration with
Claire Bataille en Paul Ibens Design
status
finished

The existing roof of the parking garage was demolished and replaced with new steel trusses, from which a new intermediate floor is suspended using steel tension rods. The horizontal ties of the trusses, spanning the atrium, are also composed of steel tension rods. The new floors consist of a timber framework with composite dovetail floors.