ORG Urbanism and Architecture BV
period
2006 -
budget
€ 520.000,00
surface area
450 m2
client
private
status
finished

A steel frame was installed atop several concrete slabs to allow for a maximally open plan on the ground floor. On the upper floor, the façade cladding is suspended from the steel frame using exposed steel brackets. The façade bricks were laid in a highly challenging vertical bond.