project
project
project
architect
Bovenbouw architectuur
period
2008 - 2012
project
construction of 67 social houses, Booischot
budget
€ 8.500.000,00
surface area
4.258 m2
client
Zonnige Kempen
energy
low energy
status
finished

Before founding the buildings on a general foundation slab, ground improvement works were carried out. The walls separating the dwellings, built in calcium silicate masonry, also form the main load-bearing lines. The floor spans are achieved in a single run by means of prestressed hollow-core slabs. The load-bearing structure of the roof planes and walkways consists of timber I-joists, glulam beams, and conventional structural timber.