project
architect
Ghislain Lams
period
2007 - 2008
budget
€ 500.000,00
surface area
1.750 m2
client
Hero bvba
status
finished

The existing warehouse foundation was reinforced using micropiles. The existing timber floors were replaced with concrete slabs cast in situ between the existing steel profiles. The existing cast-iron columns were inspected and retained. For the new roof level, new steel trusses were provided, transferring loads to a steel front façade that was integrated into the carpentry architecture.