All existing concrete floors were assessed for their load-bearing capacity and, in most cases, replaced or reinforced with a composite cast-in-place topping. The introduction of new voids and stair openings, the removal of existing columns, the addition of timber-framed volumes on the roof, and the revised floor plan required a comprehensive renovation of the existing structure. In certain areas, the foundation also needed reinforcement using micropiles. On the street side, a new building volume was constructed, providing a passageway to the newly created inner courtyard.