Loading...
project
architect
BULK-architecten
period
2006 - 2007
budget
€ 550.000,00
surface area
2.195 m2
client
stad Blankenberge
status
finished

This steel industrial hall features a central backbone composed of concrete cores and hollow prefabricated slabs. The upward wind load was particularly critical in the structural calculation of the large cantilevers.