

For the new concert and theatre hall of the Scheld’apen, an existing warehouse in the harbour district was completely renovated. The building was fully stripped back to its structural shell, and two existing floor levels were demolished in order to create halls with sufficient clear height. At ground floor level, in the midst of a newly developed urban area, a new concert hall was realised. By means of a double concrete shell running all around, it complies with today’s stringent acoustic standards. The walls of the concert hall transfer their loads to micropiles, which penetrate the existing foundations through acoustically isolated connections. The ceiling of the concert hall was preserved, albeit after being completely disconnected from the existing structure and supported by new concrete walls.
Wivina Demeester Award for Excellence in Construction Management 2014 : Conversion of a warehouse into concert halls, Antwerp (BEL-08-SCH), architect : BEL architecten
