Loading...
project
architect
Atelier Vens Vanbelle BV
period
2007 - 2009
budget
€ 450.000,00
surface area
380 m2
client
private
status
finished

The cantilevered floor was realized by anchoring in-situ cast concrete walls into the basement structure. The roof consists of a steel frame structure supporting steel deck slabs as the primary load-bearing system.