Loading...
project
architect
architektenburo Jef van Oevelen bvba
period
2008 - 2010
budget
€ 3.750.000,00
surface area
3.500 m2
client
groep Emmaüs
status
finished

The structure is composed of prefabricated concrete beams, cast in situ to form a continuous framework. The wings housing the rooms are constructed in solid masonry, with load-bearing walls and predal slab floors.