project
project
project
architect
360 architecten bv
period
2006 - 2010
budget
€ 2.100.000,00
surface area
970 m2
client
KA Boom
status
finished

The school building is designed with a mixed structural system. The office block is based on a load-bearing masonry structure combined with reinforced concrete precast floor slabs. The refectory is constructed using prestressed concrete hollow-core slabs supported by steel IFB beams. The roof is topped by a canopy formed by Y-shaped structural frames, clad with polycarbonate panels.